seems to stay around 8 amps, 14.2 was the highest I saw. I gave the centrifuge and two of the electrolyzers another energy hatch but then removed one since it's probably not needed. it might actually be higher if I run it for longer
platline will at most consume 13-14 amps, and the factory currently has 16 .... can't run the indium at the same time I guess but that's fine I wasn't exactly planning to
apparently fluid voiding covers don't work on input hatches so I had to add a steel drum for the water. the osmiridium section produces water which I electrolyze for hydrogen but I think it goes in the positive so. yed.